Phoenix, Scottsdale, Tempe, Mesa, Chandler, Gilbert, Glendale
We check your panel before we quote your charger.
EV chargers
A load check first, then the right circuit: 48 A where the panel has room, a load manager where it doesn't, and a panel upgrade only when nothing else works.
from $1,713
installed, 20 ft run, charger, tax and Phoenix permit included
- ROC CR-11 electrical licence
- City permit filed and inspected for you
- 2-year workmanship warranty

Price it now
Tell us about your panel and your home. Get a price you can hold a date against.
- 1Your home
- 2Itemised quote
- 3Date and deposit
- 4Booked
1. Your home
Rebates
Rebates available in 2026, and who files them
We fill in the forms, attach your receipt and the final permit, and follow each one until it's paid. You can see the status in your portal.
| Programme | Who qualifies | Back to you |
|---|---|---|
| SRP Level 2 charger rebate | SRP customers, qualifying charger supplied with the install | $250 |
| City smart-controller rebates | Scottsdale, Tempe, Mesa, Chandler and Gilbert water customers | $100 |
| SRP variable-speed pool pump rebate | SRP customers replacing a single-speed pump | $200 |
| Federal 30C charger credit | Ended for chargers switched on after June 30, 2026 | — |
Amounts shown for this demo; programmes change, and we check yours on the day we quote.
How an install goes
Deposit to switched on: usually two weeks.
- 01
Quote and deposit
Your answers price the job. A 25% deposit holds the date; the rest is due after the inspection passes.
- 02
Permit filed
We file the electrical permit with your city the next business day and post the number in your portal.
- 03
Permit approved
Most valley cities approve a charger or pool panel in two to five business days.
- 04
Install
Four to six hours for a charger. From May to October, outdoor work starts at 6:30 am and wraps before the heat.
- 05
City inspection
We meet the inspector, show the load calculation and the torque marks, and you get the sign-off.
- 06
Rebates filed
Receipts and the final permit go to the utility or the city; you watch the rebate move to paid.
The Phoenix year
Service scheduled to Phoenix seasons
Irrigation run times change four times a year here, pools work hardest in July, and panels lose output to dust until the monsoon. We send a reminder and a route slot, or you can request a visit in the portal.
- Irrigation spring start-up: February, MarchSummer-ready run times, heads cleared of winter debris
- Irrigation fall schedule, overseed: September, OctoberCut run times as nights cool; water the rye in October
- Irrigation winterise, backflow wraps: December, JanuaryWinter schedule and freeze wraps on the backflow
- Pool automation service: April, May, OctoberSalt cell, pump hours and heater before and after summer
- Pool freeze protection: DecemberFreeze protection set on the automation panel
- Solar check-ups: April, May, September, OctoberWash and string test before the heat and after the monsoon
Straight answers
Common questions
Do I need a panel upgrade for a charger?
Usually not. Most homes built after 1990 have a 200 A panel, and a load calculation shows room for a 40 or 48 A charger even with the AC running. When it's tight, a load manager pauses the charger at peak for about a third of the cost of an upgrade.
NACS or J1772?
Most new cars from 2025 on have the NACS (Tesla-style) port; many earlier ones use J1772. We install the charger with the plug your car has and can supply an adapter for a second car.
Why do you start at 6:30 in summer?
Garage and exterior walls pass 120°F by early afternoon from May to October. Early starts are safer for the crew and kinder to the wire and the fittings.
Can I still get the federal charger credit?
No. The 30C credit ended for chargers switched on after June 30, 2026. SRP's charger rebate is still open, and we file it for you.