EV chargers
A load check first, then the right circuit: 48 A where the panel has room, a load manager where it doesn't, and a panel upgrade only when nothing else works.
One demo system, three views. Open two in separate tabs: changes show in both.
Phoenix, Scottsdale, Tempe, Mesa, Chandler, Gilbert, Glendale
We're licensed electricians who also wire the things a Phoenix yard runs on: rooftop solar, the irrigation controller and the pool. Tell us about your panel and your car and you get a line-by-line price, the rebates that still pay, and a date.

What we install and look after

A load check first, then the right circuit: 48 A where the panel has room, a load manager where it doesn't, and a panel upgrade only when nothing else works.

String tests, inverter logs and a proper wash. Add consumption monitoring and see use against production, hour by hour.

Weather-based controllers set to the valley's four watering seasons, with a flow sensor that shuts off a broken line before the water bill does.

Pump, lights, heater and cleaner on one panel and your phone, with a variable-speed pump that runs all summer for a fraction of the power.
Price it now
Rebates
We fill in the forms, attach the receipt and the final permit, and track each one to paid. You watch it move in your portal.
| Programme | Who qualifies | Back to you |
|---|---|---|
| SRP Level 2 charger rebate | SRP customers, qualifying charger supplied with the install | $250 |
| City smart-controller rebates | Scottsdale, Tempe, Mesa, Chandler and Gilbert water customers | $100 |
| SRP variable-speed pool pump rebate | SRP customers replacing a single-speed pump | $200 |
| Federal 30C charger credit | Ended for chargers switched on after June 30, 2026 | — |
Amounts shown for this demo; programmes change, and we check yours on the day we quote.
How an install goes
Your answers price the job. A 25% deposit holds the date; the rest is due after the inspection passes.
We file the electrical permit with your city the next business day and post the number in your portal.
Most valley cities approve a charger or pool panel in two to five business days.
Four to six hours for a charger. From May to October, outdoor work starts at 6:30 am and wraps before the heat.
We meet the inspector, show the load calculation and the torque marks, and you get the sign-off.
Receipts and the final permit go to the utility or the city; you watch the rebate move to paid.
The Phoenix year
Irrigation changes four times a year here, pools work hardest in July, and panels lose output to dust until the monsoon rinses them. Customers get a reminder and a route slot; you can also ask for a visit from the portal.
Straight answers
Usually not. Most homes built after 1990 have a 200 A panel, and a load calculation shows room for a 40 or 48 A charger even with the AC running. When it's tight, a load manager pauses the charger at peak for about a third of the cost of an upgrade.
Most new cars from 2025 on have the NACS (Tesla-style) port; many earlier ones use J1772. We install the charger with the plug your car has and can supply an adapter for a second car.
Garage and exterior walls pass 120°F by early afternoon from May to October. Early starts are safer for the crew and kinder to the wire and the fittings.
No. The 30C credit ended for chargers switched on after June 30, 2026. SRP's charger rebate is still open, and we file it for you.