CVN-J-86259
EV charger + Solar check-up and monitoring
$2,478balance $1,858 due
- Quote readyMon, Aug 10
- Install date heldInstall Mon, Aug 24
- Permit filed with the cityPHX-ELE-26-41873
- Permit approvedApproved Fri, Aug 21
- Installed, inspection nextInstalled Mon, Aug 24
- Passed inspection, switched onCity of Phoenix, J. Okafor, Wed, Aug 26
Quote lines (9)
- Level 2 charger install, first 20 ft of circuit, mount and commissioning$695
- 5 × Additional circuit run, 6 AWG copper in conduit (per ft)$80
- 2-pole 60 A breaker$72
- 48 A Wi-Fi charger, NACS (Tesla) plug, 24 ft cable$629
- Solar check-up: string test, inverter log review, roof and conduit walk (8.4 kW)$189
- Consumption monitoring gateway with two current sensors$345
- Monitoring install at the main panel and app set-up$120
- City of Phoenix electrical permit (passed through at cost)$158
- Permit filing and meeting the city inspector$95